In brief

A change of use of a building (offices becoming retail or healthcare spaces) modifies the fire risk category and requires a review of the existing detection system, with advice from the emergency zone (hulpverleningszone) and validation by a BOSEC-certified installer according to NBN S21-100-1.

What is a change of use of a building, in fire safety terms?

A change of use refers to any modification of the actual use of a building or part of a building, for example offices converted into retail space accessible to the public or into healthcare facilities. This change is not merely an urban planning matter: it modifies the nature and number of occupants, their ability to evacuate independently, the quantity of combustible materials present and the risk of fire spread. The Royal Decree of 7 July 1994 establishing basic standards for fire and explosion prevention classifies buildings according to their height (low-rise, medium-rise, high-rise buildings) but the specific requirements for detection and evacuation also depend heavily on the actual use of the premises. An office space and a space accommodating persons with reduced mobility do not present the same risk profile, even in an identical structure.

Why does a transformation of use change the fire risk category?

The risk category depends directly on the type of occupants and their evacuation capacity, not solely on the building structure. Offices accommodate awake, mobile occupants familiar with the premises. A healthcare facility accommodates persons who may be bedridden, dependent or disoriented, with increased risk at night: 70% of fire victims are killed by smoke during the night, according to Belgian statistics for 2025. Retail space accessible to the public introduces variable footfall and sometimes stock of combustible goods. These parameters modify the requirements for detection, compartmentation and evacuation time, even if the building fabric does not physically change. This is why a change of use can never be considered a non-event in terms of fire safety.

What steps should be taken before converting offices into healthcare facilities or retail space?

The transformation of a building must follow a structured approach before any operation under the new use. This approach involves the manager, the prevention adviser and, depending on the case, the competent emergency zone (hulpverleningszone).

  1. 1.Analyse the new use with the prevention adviser: expected number of occupants, mobility, occupancy hours.
  2. 2.Reassess the building's fire risk in light of the Royal Decree of 7 July 1994 and the Code on Well-being at Work, Book III, Title 3.
  3. 3.Seek the advice of the territorially competent emergency zone (hulpverleningszone), particularly if the transformation modifies evacuation or compartmentation conditions.
  4. 4.Have the existing detection installation assessed by a qualified installer according to standard NBN S21-100-1.
  5. 5.Update the building's safety file before operation under the new use.

Must the existing detection system be revalidated after a change of use?

Yes: a fire detection system designed for a given use is not automatically suitable for another use, even if it remains technically functional. Standard NBN S21-100-1, which governs the design and installation of fire detection systems, requires that the design result from a risk analysis specific to the building and its occupancy. Changing the use changes this baseline risk analysis. In practical terms, revalidation may concern the placement of detectors, the choice of technology (optical, thermal, multi-criteria), the alarm zone, the target evacuation time or the alarm diffusion mode, more gradual in a healthcare facility than in an office. Periodic inspection according to NBN S21-100-2 verifies that the existing installation functions correctly, but it does not replace this design reassessment after a change of use.

Who checks the compliance of fire detection after the transformation?

Several actors intervene, each with a distinct role, to validate the compliance of a detection system after a change of use. The operator's prevention adviser leads the internal risk analysis and the safety file. The emergency zone (hulpverleningszone) provides an opinion on the transformation project and may impose additional measures, particularly regarding evacuation or compartmentation. The installer, ideally BOSEC-certified, adapts the system design according to NBN S21-100-1 and carries out acceptance tests. The ANPI organisation may provide technical support or specific opinions depending on the building type. None of these actors substitutes for the others: consistency between the emergency zone's opinion, the technical design and the safety file maintained by the operator determines the overall compliance of the transformed building.

What are the risks if detection is not adapted to the new use?

Operating a transformed building without adapting fire detection exposes to real human risk and non-compliance with the Code on Well-being at Work and the Royal Decree of 7 July 1994. In Belgium, approximately 10,000 fires occur annually in buildings, an order of magnitude reported by UGent in the absence of systematic data collection. Detection poorly calibrated for a more vulnerable population (healthcare facility) or denser occupancy (retail) delays the alert and evacuation, in a context where only one in two persons in Belgium has a smoke detector. Administratively, an emergency zone (hulpverleningszone) may refuse the operating permit or impose immediate compliance if it finds that the detection system no longer corresponds to the actual use of the building.

Frequently asked questions

  • change of use
  • fire detection
  • belgian regulations
  • nbn s21-100-1
  • emergency zone

Have your system checked before someone else does it for you.

On-site audit within 48 h, no obligation. You leave with a written report, whether we work together or not.