In brief

The internal emergency plan (IEP) describes the human actions to be taken as soon as the fire detection system raises the alarm. The employer, through their prevention advisor, remains responsible for consistency between the two, in consultation with the detection installer and the emergency zone (hulpverleningszone).

What is the internal emergency plan and what is its link with fire detection?

The internal emergency plan (IEP) is the document that describes the actions that a company's personnel must take as soon as a fire outbreak is reported: who alerts whom, who shuts off what, who guides the evacuation, who receives the emergency services. The Code on Well-being at Work (Book III, Title 3, dedicated to fire prevention in the workplace) requires the employer to organize these internal procedures.

The fire detection system is the physical element that triggers this plan: a control panel compliant with standard NBN S21-100-1 detects smoke or heat, then transmits an alarm signal. The IEP only makes sense if it is built around the actual behavior of this control panel: detection zones, time delays, type of alarm triggered. The two documents must therefore be read together, never separately.

Who must update the IEP when the detection system evolves?

The joint updating of the IEP and the detection installation is the responsibility of the employer or building operator, who generally delegates this task to their prevention advisor. The latter must be informed of any technical modification affecting detection, and vice versa.

This coordination is necessary whenever:

  • a new detection zone is created or a room changes use,
  • the fire control panel is replaced or reprogrammed,
  • the division of restricted or general alarm zones is modified,
  • the organization of personnel or evacuation routes changes.
ActorRole in joint updating
Employer / operatorFinal legal responsibility, arbitrates priorities
Prevention advisorDrafts and updates the IEP, liaises with detection
Detection installer or technicianDocuments technical modifications, informs the prevention advisor
Emergency zone (hulpverleningszone)Provides advice on procedures, checks overall consistency

None of these actors can act alone: an IEP that is up to date on paper but disconnected from a control panel modified without information loses all operational value.

What must the IEP provide for in case of fire alarm activation?

The IEP must describe, for each type of signal emitted by the detection control panel, the concrete action expected from personnel. A detector activation does not automatically trigger general evacuation: standard NBN S21-100-1 distinguishes several signal levels, and the IEP must address each separately.

SignalRecipientAction provided in the IEP
Restricted alarmDesignated personnel (guard room, technical service)On-site verification, investigation
General alarmAll occupantsImmediate evacuation according to defined routes
Transmitted alertEmergency zone (hulpverleningszone)Emergency services intervention

Without this distinction written in black and white, personnel do not know how to react differently to a restricted alarm and a general alarm, which causes either unnecessary evacuations or dangerous delays.

What is the difference between restricted alarm and general alarm in the IEP?

The restricted alarm is a signal sent to a limited number of trained people (technical service, duty person) to verify the reality of an incident before alerting the entire building. The general alarm triggers the evacuation of all or part of the occupants.

The IEP must set the time delay between these two phases: the period during which the investigation team can intervene before the general alarm is automatically triggered if no one has cancelled the process. This delay, its designated responsible persons by job title, and the confirmation or cancellation procedure must appear explicitly in the plan, not only in the technical configuration of the control panel. A discrepancy between the delay actually programmed in the control panel and that described in the IEP is a frequent non-compliance during inspections.

Who is responsible in case of discrepancy between the detection system and the IEP?

Responsibility for a discrepancy between the detection installation and the internal emergency plan rests with the employer or building operator, as the legal person responsible for fire safety under the Code on Well-being at Work. The prevention advisor is the operational relay of this responsibility.

This concretely means that if a control panel has been modified (addition of detectors, reprogramming of a time delay, change of zoning) without the IEP being revised accordingly, it is the operator who bears the non-compliance, even if it was the installer who carried out the technical work. The installer remains obliged to document and report modifications, but does not have the power to decide internal company procedures alone. The emergency zone (hulpverleningszone), during its reviews and inspections, precisely checks this consistency between the actual operation of the installation and the written procedures.

How often must detection and the IEP be tested jointly?

The joint testing of the detection system and the internal emergency plan must take place at regular intervals, and not only during initial installation. Standard NBN S21-100-2 requires periodic inspection of the detection installation, carried out by a qualified technician, with a minimum frequency generally annual depending on the system configuration.

These technical inspections must be supplemented by periodic evacuation drills, during which personnel actually react to the alarm activation, not to a theoretical simulation. It is during these drills that discrepancies between the actual configuration of the control panel and the text of the IEP most often appear: misunderstood time delay, obstructed evacuation route, assembly point that has become unsuitable after construction work. The prevention advisor records the findings of each drill and initiates, if necessary, revision of the plan.

Frequently asked questions

  • internal emergency plan
  • fire detection
  • prevention advisor
  • nbn s21-100-1
  • belgian fire regulations